Capturing rework costs in projects
Authors:
- 1 June 2003
- journal article
- Published by Emerald Publishing in Managerial Auditing Journal
- Vol. 18 (4) , 329-339
Abstract
Rework has become an endemic feature of the procurement process in construction, which invariably leads to time and cost overruns in projects. Thus, in order to improve the performance of projects it is necessary to identify the causes and costs of rework. The research presented in this paper quantifies the causes, magnitude and costs of rework experienced in two Australian construction projects procured using different contractual arrangements. The causes and costs of rework projects are analyzed and discussed. The case study projects’ rework costs were found to be 3.15 per cent and 2.4 per cent of their contract value. Changes initiated by the client and end-user, as well as errors and omissions in contract documentation, were found to be the primary causes of rework. Recommends that construction companies and consultant firms, particularly design consultants, implement quality management practices as well as place greater attention on the design development process, to prevent rework emerging during the project’s later stages.Keywords
This publication has 11 references indexed in Scilit:
- Quality failure costs in civil engineering projectsInternational Journal of Quality & Reliability Management, 2000
- The causes and costs of defects in constructionAutomation in Construction, 1999
- A quantitative study of post contract award design changes in constructionConstruction Management and Economics, 1999
- Rework: a symptom of a dysfunctional supply-chainEuropean Journal of Purchasing & Supply Management, 1999
- The cost of non-conformance during a highway project: a case studyConstruction Management and Economics, 1995
- Capturing the Cost of Quality Failures in Civil EngineeringInternational Journal of Quality & Reliability Management, 1993
- Causes of Quality Deviations in Design and ConstructionJournal of Construction Engineering and Management, 1992
- Measuring Design and Construction Quality CostsJournal of Construction Engineering and Management, 1989
- Mixing Qualitative and Quantitative Methods: Triangulation in ActionAdministrative Science Quarterly, 1979
- Organizational Reality: Reports from the Firing Line.Administrative Science Quarterly, 1979