AN EXPOSITION OF MULTIPLE CONSTRAINT SCHEDULING AS IMPLEMENTED IN THE GOAL SYSTEM (FORMERLY DISASTERTM)
Authors:
- 3 January 1997
- journal article
- Published by SAGE Publications in Production and Operations Management
- Vol. 6 (1) , 3-22
Abstract
No abstract availableKeywords
This publication has 12 references indexed in Scilit:
- Modelling setup times, process batches and transfer batches using activity network logicEuropean Journal of Operational Research, 1996
- Optimizing theory of constraints when multiple constrained resources existEuropean Journal of Operational Research, 1993
- The missing link between manufacturing strategy and production planningInternational Journal of Production Research, 1992
- Theory of constraints and linear programming: a comparisonInternational Journal of Production Research, 1992
- AN ANALYSIS AND DISCUSSION OF THE OPTIMIZED PRODUCTION TECHNOLOGY SOFTWARE AND ITS USEProduction and Operations Management, 1992
- Empirical research methods in operations managementJournal of Operations Management, 1990
- Synchronized manufacturing as in OPT: from practice to theoryComputers & Industrial Engineering, 1990
- The Shifting Bottleneck Procedure for Job Shop SchedulingManagement Science, 1988
- Computerized shop floor schedulingInternational Journal of Production Research, 1988
- An Implicit Enumeration Algorithm for the Machine Sequencing ProblemManagement Science, 1971