Quantifying the impacts of rework, schedule pressure, and ripple effect loops on project schedule performance
- 1 January 2016
- journal article
- research article
- Published by Wiley in System Dynamics Review
- Vol. 32 (1) , 82-96
Abstract
No abstract availableKeywords
This publication has 15 references indexed in Scilit:
- Inventory record inaccuracy: Causes and labor effectsJournal of Operations Management, 2015
- Inter‐phase feedbacks in construction projectsJournal of Operations Management, 2015
- Documentation for model transparencySystem Dynamics Review, 2012
- System Dynamics Transforms Fluor Project and Change ManagementInterfaces, 2012
- System dynamics applied to project management: a survey, assessment, and directions for future researchSystem Dynamics Review, 2007
- Statistical screening of system dynamics modelsSystem Dynamics Review, 2005
- Dynamic Planning for Fast-Tracking Building Construction ProjectsJournal of Construction Engineering and Management, 2001
- Dynamic modeling of product development processesSystem Dynamics Review, 1998
- Sensitivity analysis and optimization of system dynamics models: Regression analysis and statistical design of experimentsSystem Dynamics Review, 1995
- Naval Ship Production: A Claim Settled and a Framework BuiltInterfaces, 1980