Benchmarking of construction projects performance for comparative assessment and performance improvement: a statistical quantitative approach
Authors:
- 20 February 2023
- journal article
- research article
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 31 (7) , 2829-2851
Abstract
Purpose: The exact process of construction projects performance assessment and benchmarking still remains subjective relying on qualitative techniques, which does not allow stakeholders to address the issues and the drawbacks of their respective projects as effectively as possible for performance improvement purposes. Hence, this research aims to establish a unified project performance score (PPS) for assessing and comparing projects performance.Design/methodology/approach: Data were collected from Construction Industry Institute (CII) members and through University of Wisconsin active research projects. Exploratory data analysis was done to investigate the calculated performance metrics and the collected data characteristics. Data were converted into six performance metrics which were used as the independent variables in creating the PPS model. Logistic regression model was developed to generate the unified PPS equation in order to explain the variables that significantly affect construction projects successful post-completion performance. The PPS model was then applied on the collected dataset to benchmark projects in terms of project delivery systems, compensation types and project types in order to showcase the PPS capabilities and possible applications.Findings: The model revealed that construction cost and schedule growth are the most important metrics in assessing projects performance, while RFIs’ processing time and change orders per million dollars were the features with the least effect on the PPS value. The authors found that integrated project delivery (IPD) and target value (TV) projects outperformed all other project delivery and compensation types. While, industrial projects showed the worst performance, as compared to commercial or institutional projects.Originality/value: The PPS model can be used to assess the performance of any pool of executed projects, and introducing a novel addition to the field of construction business analytics which is a supplementary tool to successful decision making and performance improvement. Additionally, the bidding selection system can be revolutionized from a cost-based to a performance based one using the PPS model to improve the outcomes of the buyout process.Keywords
This publication has 41 references indexed in Scilit:
- A critical review of performance measurement in constructionJournal of Facilities Management, 2010
- Comparative Analysis of Project Delivery Systems Cost Performance in Pacific Northwest Public SchoolsJournal of Construction Engineering and Management, 2008
- Benchmarking the performance of design‐build projectsBenchmarking: An International Journal, 2007
- Comparable Performance Measurement System for Construction CompaniesJournal of Management in Engineering, 2007
- Management of Construction Firm Performance Using BenchmarkingJournal of Management in Engineering, 2007
- Benchmarking Initiatives in the Construction Industry: Lessons Learned and Improvement OpportunitiesJournal of Management in Engineering, 2006
- The role of leaders' paradigm in construction industry changeConstruction Management and Economics, 2004
- Project Delivery Systems and Project Change: Quantitative AnalysisJournal of Construction Engineering and Management, 2003
- U.S. Construction Labor Productivity Trends, 1970–1998Journal of Construction Engineering and Management, 2001
- Project Success Index for Capital Facility Construction ProjectsJournal of Performance of Constructed Facilities, 1999