Machine scheduling with job delivery coordination
Authors:
- Yung-Chia ChangYCYung-Chia Chang
- Chung-Yee LeeCLChung-Yee Lee
- 1 October 2004
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 158 (2) , 470-487
Abstract
No abstract availableKeywords
This publication has 24 references indexed in Scilit:
- Scheduling with generalized batch delivery dates and earliness penaltiesIIE Transactions, 2000
- Scheduling with batching: A reviewEuropean Journal of Operational Research, 2000
- Scheduling a two-machine flowshop with travel times to minimize maximum latenessInternational Journal of Production Research, 1997
- A note on the complexity of single-machine scheduling with a common due date, earliness-tardiness, and batch delivery costsEuropean Journal of Operational Research, 1996
- Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costsEuropean Journal of Operational Research, 1996
- heuristics for parallel machine scheduling with delivery timesActa Informatica, 1994
- Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and ComplexityJournal of the Operational Research Society, 1992
- Scheduling of a Two-machine Flowshop with Travel Time Between MachinesJournal of the Operational Research Society, 1991
- Scheduling Parts in a Combined Production-transportation Work CellJournal of the Operational Research Society, 1990
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954