Some Observations to: Lot Sizing with Non-zero Setup Times for Rework
- 31 March 2017
- journal article
- research article
- Published by Springer Nature in International Journal of Applied and Computational Mathematics
- Vol. 3 (S1) , 1511-1517
Abstract
No abstract availableKeywords
This publication has 9 references indexed in Scilit:
- A single machine EPQ inventory model for a multi-product imperfect production system with rework process and auctionInternational Journal of Advanced Logistics, 2016
- A multi-machine multi-product EPQ problem for an imperfect manufacturing system considering utilization and allocation decisionsExpert Systems with Applications, 2016
- Impact of trade credit and inflation on retailer's ordering policies for non-instantaneous deteriorating items in a two-warehouse environmentInternational Journal of Production Economics, 2016
- A Fuzzy EOQ Model with Allowable Shortage under Different Trade Credit TermsApplied Mathematics & Information Sciences, 2016
- A multiproduct single machine economic production quantity model for an imperfect production system under warehouse construction costInternational Journal of Production Economics, 2015
- Effect of deterioration on two-warehouse inventory model with imperfect qualityComputers & Industrial Engineering, 2015
- A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing processInternational Journal of Production Economics, 2014
- Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraintJournal of Computational and Applied Mathematics, 2010
- Lot sizing with non-zero setup times for reworkJournal of Systems Science and Systems Engineering, 2008