Evaluation of safety performance during construction and servicing stages of Liuxi river bridge
Author:
Open Access
- 2 April 2020
- journal article
- research article
- Published by JVE International Ltd. in Vibroengineering PROCEDIA
- Vol. 30, 199-204
Abstract
Prestressed concrete continuous beam-arch composite bridge with concrete-filled steel tube is a new type of bridge developed in recent years. It has the characteristics of strong spanning ability and large in-plane stiffness, but the lateral stiffness of the arch ribs for this type of bridge is relatively weak. In order to effectively improve the construction quality and structure stability, and optimize the mechanical properties, and in addition of realize the design of large span continuous beam-arch composite bridge, a comprehensive safety assessment of the Liuxi River bridge during construction and serving stages located in China was conducted in this paper. The results show that the bridge had favorable safety margin during the construction and severing stages. The outcomes of this study can provide technical support for the safety and smooth implementation of the bridge’s safeguard, which has important theoretical significance and engineering application value.Keywords
This publication has 4 references indexed in Scilit:
- Structural Evaluation of Steel–Concrete Joint with UHPC Grout in Single Cable–Plane Hybrid Cable-Stayed BridgesJournal of Bridge Engineering, 2019
- Push-out tests for perfobond strip connectors with UHPC grout in the joints of steel-concrete hybrid bridge girdersEngineering Structures, 2017
- Train-induced field vibration measurements of ground and over-track buildingsScience of The Total Environment, 2017
- Longitudinal force in continuously welded rail on long-span tied arch continuous bridge carrying multiple tracksJournal of Central South University, 2015