Improved Critical Chain Project Management Framework for Scheduling Construction Projects
Authors:
- 1 December 2014
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 140 (12)
Abstract
No abstract availableKeywords
This publication has 34 references indexed in Scilit:
- Multiresource Leveling in Line-of-Balance SchedulingJournal of Construction Engineering and Management, 2013
- A process framework for theoretically grounded prescriptive research in the project management fieldInternational Journal of Project Management, 2013
- Project management: Recent developments and research opportunitiesJournal of Systems Science and Systems Engineering, 2012
- Buffer sizing approach with dependence assumption between activities in critical chain schedulingInternational Journal of Production Research, 2012
- Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithmInternational Journal of Production Economics, 2011
- Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraintsAutomation in Construction, 2009
- Critical chain and risk analysis applied to high-risk industry maintenance: A case studyInternational Journal of Project Management, 2009
- Multi-Project Scheduling and Control: A Process-Based Comparative Study of the Critical Chain Methodology and Some AlternativesProject Management Journal, 2004
- Network Resource Allocation with Support of a Fuzzy Expert SystemJournal of Construction Engineering and Management, 1990
- Resource Leveling in Construction by OptimizationJournal of Construction Engineering and Management, 1989