Push-out test: Why bother?
Authors:
- Alexandre LavrovALAlexandre Lavrov
- Mohammad BhuiyanMBMohammad Bhuiyan
- Anna StroiszASAnna Stroisz
- 1 January 2019
- journal article
- research article
- Published by Elsevier in Journal of Petroleum Science and Engineering
- Vol. 172, 297-302
Abstract
No abstract availableKeywords
This publication has 19 references indexed in Scilit:
- Cement Sheath Integrity for CO2 Storage – An Integrated PerspectiveEnergy Procedia, 2013
- Degradation of cement at the reservoir/cement interface from exposure to carbonated brineInternational Journal of Greenhouse Gas Control, 2011
- The Effect of Specimen Size on Strength and Other Properties in Laboratory Testing of Rock and Rock-Like Cementitious Brittle MaterialsRock Mechanics and Rock Engineering, 2011
- Experimental investigation of wellbore integrity and CO2–brine flow along the casing–cement microannulusInternational Journal of Greenhouse Gas Control, 2010
- Evaluation of Cement Systems for Oil and Gas-Well Zonal Isolation in a Full-Scale Annular GeometrySPE Drilling & Completion, 2005
- The single-fibre pull-out test. 2: Quantitative evaluation of an uncatalysed TGDDM/DDS epoxy cure studyComposites Part A: Applied Science and Manufacturing, 1996
- The single-fibre pull-out test. 1: Review and interpretationComposites Part A: Applied Science and Manufacturing, 1996
- The Effects of Temperature and Cement Admixes on Bond StrengthJournal of Petroleum Technology, 1992
- Stick-slip during fibre pull-outScripta Metallurgica, 1989
- A Study of Cement-Pipe BondingJournal of Petroleum Technology, 1964