Sequencing mixed-model assembly lines to minimize part inventory cost
- 21 June 2007
- journal article
- research article
- Published by Springer Nature in OR Spectrum
- Vol. 30 (3) , 611-633
Abstract
No abstract availableKeywords
All Related Versions
This publication has 32 references indexed in Scilit:
- Controlling mixed-model assembly lines in real-time by using distributed systemsEuropean Journal of Operational Research, 2006
- The maximum deviation just-in-time scheduling problemDiscrete Applied Mathematics, 2004
- Modelling an industrial strategy for inventory management in supply chains: The 'Consignment Stock' caseInternational Journal of Production Research, 2003
- Stochastic procedures for scheduling minimum job sets on mixed model assembly linesJournal of the Operational Research Society, 1997
- Heuristics and exact algorithms for solving the Monden problemEuropean Journal of Operational Research, 1996
- Sequencing mixed-model assembly lines to level parts usage and minimize line lengthInternational Journal of Production Research, 1994
- Algorithms for real-time scheduling of jobs on mixed model assembly linesComputers & Operations Research, 1994
- An analytic framework for sequencing mixed model assembly linesInternational Journal of Production Research, 1992
- Developing production schedules which balance part usage and smooth production loads for just‐in‐time production systemsNaval Research Logistics (NRL), 1991
- Line Balancing-Sequencing for Mixed-Model AssemblyManagement Science, 1967