Setting time: An important criterion to determine the length of the delay period before steam curing of concrete
Authors:
- T.K. ErdemTET.K. Erdem
- L. TuranliLTL. Turanli
- T.Y. ErdoganTET.Y. Erdogan
- 1 May 2003
- journal article
- Published by Elsevier in Cement and Concrete Research
- Vol. 33 (5) , 741-745
Abstract
No abstract availableKeywords
This publication has 9 references indexed in Scilit:
- Delayed ettringite formationCement and Concrete Research, 2001
- Compressive strength development of concrete with different curing time and temperatureCement and Concrete Research, 1998
- Deterioration of heat-cured mortars due to the combined effect of delayed ettringite formation and freeze/thaw cyclesCement and Concrete Research, 1997
- Performance of concrete under different curing conditionsCement and Concrete Research, 1996
- The microstructure of concrete cured at elevated temperaturesCement and Concrete Research, 1995
- Significance of pre-existing cracks on nucleation of secondary ettringite in steam cured cement pasteCement and Concrete Research, 1994
- Development of microstructures in plain cement pastes hydrated at different temperaturesCement and Concrete Research, 1991
- Mechanism of Sulfate Expansion in Hydrated Portland CementJournal of the American Ceramic Society, 1988
- Short-term steam-curing and concrete later-age strengthMaterials and Structures, 1978