Contractor's bid pricing strategy: a model with correlation among competitors' prices
Open Access
- 27 June 2019
- journal article
- research article
- Published by Walter de Gruyter GmbH in Open Engineering
- Vol. 9 (1) , 159-166
Abstract
The approach used by construction companies to determine bid prices is an element of their strategy used to win jobs in competitive tenders. Such strategies build upon an analysis of the contactor's potential and capabilities (am I able to deliver? am I eligible to participate in the tender?), and the analysis of the economic environment, including the expected behavior of competitors. The tender strategy sets out both the guidelines and the procedure in deciding whether or not to bid as well as the rules for determining the price. The price, on the one hand, should be high enough to cover expected direct and indirect costs as well as risk-adjusted profit. On the other hand, it needs to be low enough to be considered most attractive (typically: the lowest) among the prices offered by the competitors. The paper focuses on the price definition component of the bidding strategy. It provides a brief overview of the existing methods that support bidding decisions by comparing their demand for input and limitations in practical applications and presents a simulation-based method supporting the determination of the profit ratio. This probabilistic method assumes the existence of a positive correlation between the prices offered by the competitors. Its application is illustrated by means of a numerical example. The outcomes of the simulation prompt the amount of the profit margin that maximizes the expected value of the contractor's profit.Keywords
This publication has 31 references indexed in Scilit:
- Bayesian method for the correlated competitive bidding modelConstruction Management and Economics, 2012
- Simulating the winning bid: A generalized approach for optimum markup estimationAutomation in Construction, 2012
- A correlated bidding model for markup size decisionsConstruction Management and Economics, 2011
- Best-Value Model Based on Project Specific CharacteristicsJournal of Construction Engineering and Management, 2008
- An exploratory project expert system for eliciting correlation coefficient and sequential updating of duration estimationExpert Systems with Applications, 2006
- Neural network models for intelligent support of mark‐up estimationEngineering, Construction and Architectural Management, 1996
- The optimum markup when bidding with uncertain costsEuropean Journal of Operational Research, 1990
- The competitive bidding process: Beyond probability modelsIndustrial Marketing Management, 1987
- Assessment of a Prior Distribution for the Correlation Coefficient in a Bivariate Normal DistributionJournal of the Royal Statistical Society. Series A (General), 1982
- Competitive Bidding: Deciding the Best Combination of Non-Price FeaturesJournal of the Operational Research Society, 1968