Abstract
To enhance construction efficiency, improve lining quality, and reduce project costs, this study proposes a prefabricated arch structure scheme for large-span open-cut highway tunnels, specifically targeting the ongoing construction of an eight-lane open-cut tunnel on Chongqing’s Xinsen Avenue. By establishing a finite element “load-structure” integrated calculation model and adopting an iterative analysis method, the impact of joint stiffness variations on internal force distribution was determined. Combined with long-term field monitoring and measurements, a thorough analysis was conducted on the performance of the prefabricated arch structure during different construction stages. The results indicate that after assembly into a ring, the structure undergoes a self-adaptive adjustment phase, during which the joints experience significant stress and deformation. Following top-layer backfilling and water level restoration, the axial force on the joints increases, while stress and deformation decrease, exerting a positive effect on the joint bearing capacity. From the construction period to post-opening operations, the stress variation experienced by the joints remains within a controllable range, demonstrating substantial safety margins. This fully validates the safety and reliability of the prefabricated arch structure scheme.
Funding Information
  • National Natural Science Foundation of China (52078089, 52274176)
  • Chongqing Natural Science Foundation Innovation and Development Joint Fund (CSTB2022NSCQ-LZX0079)
  • Research and Innovation Program for Graduate Students in Chongqing (CYB23242)
  • China Construction Seventh Bureau Science and Technology R & D Project (CSCEC7B-2022-Z-19)
  • 2022 Construction Science and Technology Plan Project-Group 1-New Urban Infrastructure Construction ((CKZ No. 2022-1-13)

This publication has 11 references indexed in Scilit: