Alternate Routing Strategies in Batch Manufacturing: An Evaluation
Authors:
- 1 December 1988
- journal article
- Published by Wiley in Decision Sciences
- Vol. 19 (4) , 713-733
Abstract
Batch manufacturing firms are experiencing significant changes because of technological developments in work center design, such as flexible manufacturing systems (FMS) and planning/control tools like computer‐aided process planning (CAPP). These new developments provide production managers with some solutions to a number of complex problems. For example, numerical‐controlled (NC) machine center installations are effective in providing quality parts because of tight tolerance specifications built into the equipment. However, these highly efficient centers create bottlenecks that constrain shop throughput, since production planners tend to rely too much on them.To help improve manufacturing planning, we introduce an important element to the batch production scheduling component of CAPP's mission—evaluating possible alternate routes. Production scheduling encompasses job route selection as well as machine center assignment (loading), job releasing, and setting due dates. In this paper, three routing strategies requiring different levels of shop floor information are tested and evaluated using computer simulation. Shop performance is measured by total cost and traditional measures of job flow time, lateness, and tardiness.Keywords
This publication has 12 references indexed in Scilit:
- Robotics for smaller manufacturers: Myths and realitiesBusiness Horizons, 1986
- A state-of-the-art survey of dispatching rules for manufacturing job shop operationsInternational Journal of Production Research, 1982
- Job shop controlInternational Journal of Production Research, 1981
- Grouping Observations in Digital SimulationManagement Science, 1978
- Critical Ratio Scheduling with Queue Waiting Time Information: An Experimental AnalysisA I I E Transactions, 1976
- Effects of Shop Size and Labor Flexibility in Labor and Machine Limited Production SystemsManagement Science, 1975
- An Economic Evaluation of Job Shop Dispatching RulesManagement Science, 1973
- Priority Scheduling and Inventory Control in Job Lot Manufacturing SystemsA I I E Transactions, 1972
- A Simulation of Labor Efficiency and Centralized Assignment in a Production ModelManagement Science, 1970
- Work Flow Structure: An Analysis for Planning and ControlManagement Science, 1970