Flexible job shop scheduling with overlapping in operations
- 1 July 2009
- journal article
- Published by Elsevier in Applied Mathematical Modelling
- Vol. 33 (7) , 3076-3087
Abstract
No abstract availableKeywords
This publication has 11 references indexed in Scilit:
- Mathematical modeling and heuristic approaches to flexible job shop scheduling problemsJournal of Intelligent Manufacturing, 2007
- Flexible job shop scheduling with tabu search algorithmsThe International Journal of Advanced Manufacturing Technology, 2006
- A heuristic to schedule flexible job-shop in a glass factoryEuropean Journal of Operational Research, 2005
- An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problemsComputers & Industrial Engineering, 2005
- Pareto-optimality approach for flexible job-shop scheduling problems: hybridization of evolutionary algorithms and fuzzy logicMathematics and Computers in Simulation, 2002
- An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu searchAnnals of Operations Research, 1997
- Tabu search for the job-shop scheduling problem with multi-purpose machinesOR Spectrum, 1994
- Routing and scheduling in a flexible job shop by tabu searchAnnals of Operations Research, 1993
- Job-shop scheduling with multi-purpose machinesComputing, 1990
- The Complexity of Flowshop and Jobshop SchedulingMathematics of Operations Research, 1976