Balanceability of a work-sharing line using floating workers and its comparison with floating work strategy
Authors:
- 23 July 2020
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 59 (19) , 5903-5912
Abstract
This study deals with a long-term design issue of dynamic line balancing (DLB) when work- sharing is allowed among stations. The work-sharing can be implemented by floating works or floating workers where a portion of tasks or workers is shifted to the succeeding station respectively. We suggest a mathematical model to minimise line cycle time in floating-worker environments. The line considered in this study is a 2-skill chaining line where each worker can help only the immediately downstream station. We suggest a closed form condition of balanceable floating-worker lines (FRL) in case of straight line configuration and U-shaped line configurations along with a comparison with floating-work lines (FKL). We could prove that the FRL is more efficient than the FKL as long as the floating line is balanceable. In case of a U-shaped line, we find that both the FKL and the FRL are always balanceable with the minimum cycle time, which is the total task time divided by the number of stations.Keywords
This publication has 16 references indexed in Scilit:
- Optimal workforce assignment to operations of a paced assembly lineEuropean Journal of Operational Research, 2018
- Minimising throughput loss in assembly lines due to absenteeism and turnover via work-sharingInternational Journal of Production Research, 2013
- Manufacturing cycle time reduction for batch production in a shared worker environmentInternational Journal of Production Research, 2013
- Bi-directional work sharing in assembly lines with strict and flexible assembly sequencesInternational Journal of Production Research, 2011
- Some new results on the analysis and simulation of bucket brigades (self-balancing production lines)International Journal of Production Research, 2008
- Design and operation of dynamic assembly lines using work-sharingInternational Journal of Production Research, 2006
- Throughput maximization in serial production lines with worksharingInternational Journal of Production Economics, 2006
- A survey of the self-balancing production lines (?bucket brigades?)Journal of Intelligent Manufacturing, 2005
- Factors affecting opportunity of worksharing as a dynamic line balancing mechanismIIE Transactions, 2002
- A Production Line that Balances ItselfOperations Research, 1996