VIKOR method for ranking concrete bridge repair projects with target-based criteria
Authors:
- Zhicheng GaoZGZhicheng Gao
- Robert Y. LiangRLRobert Y. Liang
- Tiemin XuanTXTiemin Xuan
Open Access
- 1 September 2019
- journal article
- research article
- Published by Elsevier in Results in Engineering
- Vol. 3
Abstract
No abstract availableKeywords
This publication has 27 references indexed in Scilit:
- Application of fuzzy VIKOR and environmental impact analysis for material selection of an automotive componentMaterials & Design (1980-2015), 2012
- A fuzzy VIKOR method for supplier selection based on entropy measure for objective weightingExpert Systems with Applications, 2011
- Use of indices to assess the performance of existing and repaired concrete structuresConstruction and Building Materials, 2009
- Developing a fuzzy TOPSIS approach based on subjective weights and objective weightsExpert Systems with Applications, 2009
- A methodological concept for material selection of highly sensitive components based on multiple criteria decision analysisExpert Systems with Applications, 2009
- A probabilistic methodology for bridge deck condition assessmentBridge Structures, 2008
- From comparative risk assessment to multi-criteria decision analysis and adaptive management: Recent developments and applicationsEnvironment International, 2006
- Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSISEuropean Journal of Operational Research, 2004
- Bridge Management for the 21st CenturyTransportation Research Record: Journal of the Transportation Research Board, 2000
- Determining objective weights in multiple criteria problems: The critic methodComputers & Operations Research, 1995