A tabu search algorithm for unrelated parallel machine scheduling with sequence- and machine-dependent setups: minimizing total tardiness
Authors:
- Jae-Ho LeeJLJae-Ho Lee
- Jae-Min YuJYJae-Min Yu
- Dong-Ho LeeDong-Ho Lee
- 24 July 2013
- journal article
- research article
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 69 (9-12) , 2081-2089
Abstract
No abstract availableKeywords
This publication has 30 references indexed in Scilit:
- Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup timesComputers & Operations Research, 2008
- Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costsComputers & Operations Research, 2005
- Minimizing the weighted number of tardy jobs on parallel processorsEuropean Journal of Operational Research, 2005
- Unrelated parallel machine scheduling with setup times using simulated annealingRobotics and Computer-Integrated Manufacturing, 2002
- Scheduling of parallel identical machines to maximize the weighted number of just-in-time jobsComputers & Operations Research, 2002
- Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up timesInternational Journal of Production Research, 2000
- Scheduling jobs on parallel machines with sequence-dependent setup timesEuropean Journal of Operational Research, 1997
- Resource optimal control in some single-machine scheduling problemsIEEE Transactions on Automatic Control, 1994
- Textile Production Systems: a Succession of Non-identical Parallel Processor ShopsJournal of the Operational Research Society, 1991
- A state-of-the-art review of parallel-machine scheduling researchEuropean Journal of Operational Research, 1990