Applicability of Top Gas Recycle Blast Furnace with Downstream Integration and Sequestration in an Integrated Steel Plant
- 22 August 2014
- journal article
- research article
- Published by Wiley in Steel Research International
- Vol. 86 (5) , 502-516
Abstract
The worldwide problem of global warming and climate change has led to consideration of the top gas recycle (TGR) blast furnace with significant potential to reduce CO2 emissions and replace conventional blast furnace operations. However, when the objective is to replace conventional blast furnace in an integrated steel plant, choice of a TGR blast furnace may require careful consideration with respect to input burden quality, availability of downstream energy and the quantity of CO2 to be sequestered. A simple spreadsheet based TGR system model using a two‐zone furnace model and a vacuum pressure swing adsorption (VPSA) system has been developed to simulate the behavior of TGR blast furnace under different operating conditions. The choice of TGR blast furnace with no pulverized coal injection (PCI) and low oxygen enrichment has been considered to be inappropriate even with a relatively rich grade burden, since no significant reduction of carbon rate could be achieved. On the other hand, for leaner grade burden with PCI and higher blast oxygen enrichment, the total carbon requirements are estimated to be brought down from 420–440 to 323–342 kg thm−1 under optimal conditions. However, there is a substantial reduction in available downstream energy. To meet the energy demand of an integrated steel plant, additional energy supply with its associated emissions for energy needs to be foreseen while net carbon emissions of a TGR blast furnace based integrated steel plant requires re‐estimation.Keywords
This publication has 14 references indexed in Scilit:
- Top gas recycling blast furnace developments for ‘green’ and sustainable ironmakingIronmaking & Steelmaking: Processes, Products and Applications, 2013
- Numerical Evaluation of Blast Furnace Performance under Top Gas Recycling and Lower Temperature OperationSteel Research International, 2010
- Design and Application of a Spreadsheet-based Model of the Blast Furnace FactoryISIJ International, 2010
- Effect of hot reducing gas (HRG) injection on blast furnace operational parameters: theoretical investigationIronmaking & Steelmaking: Processes, Products and Applications, 2008
- Numerical Simulation of Innovative Operation of Blast Furnace Based on Multi-Fluid ModelJournal of Iron and Steel Research International, 2006
- Analysis on Material and Energy Balances of Ironmaking Systems on Blast Furnace Operations with Metallic Charging, Top Gas Recycling and Natural Gas InjectionISIJ International, 2006
- Design of Innovative Blast Furnace for Minimizing CO2 Emission Based on Optimization of Solid Fuel Injection and Top Gas RecyclingISIJ International, 2004
- Elección de regímenes tecnológicos de un alto horno operando con inyección de gases reductores calientesRevista de Metalurgia, 2002
- Prediction of Blast Furnace Performance with Top Gas Recycling.ISIJ International, 1998
- Process Characteristics of a Commercial-scale Oxygen Blast Furnace Process with Shaft Gas Injection.ISIJ International, 1992