Analysing the worlds first major component replacements on floating offshore wind turbines

Authors:

Abstract
Floating offshore wind turbines offer access to an almost unlimited wind resource in deep water conditions. However, their operation and maintenance (O&M) present challenges, particularly for major component replacements (MCRs) due to increased logistical complexity, weather-related risks, and consequently higher costs. These challenges introduce uncertainty for decision-makers, as effective MCR strategies are critical for optimising operational expenditure and supporting commercial-scale deployment. This study aims to quantify these uncertainties by analysing the world’s first floating MCR operations at Kincardine Offshore Wind Farm and Hywind Scotland. Vessel automatic identification system data is used to reconstruct operational timelines for three tow-to-port (TTP) operations and one on-site self-hoisting crane (SHC) operation. The operations are compared to identify key performance drivers. Results indicate a significant reduction in disconnection, reconnection, and towing times between successive TTP operations at Kincardine. Meanwhile, TTP operations at Hywind Scotland demonstrated further improvements across all metrics. Weather data collected during the operations highlight the influence of sea state conditions on towing performance. The tracked on-site SHC operation at Kincardine exhibits a significantly shorter operation duration, requiring fewer vessels and fewer resources, demonstrating the potential for cost savings and reduced downtimes in comparison to TTP operations. The findings hope to inform the wider offshore wind community, and support O&M modelling efforts to de-risk future projects.

This publication has 4 references indexed in Scilit: