Abstract
This paper introduces a new design approach for an islanded Microgrid of a commercial building. The proposed design optimizes the sizing of the microgrid components: a rooftop PV power system, a Battery Energy Storage System, and an ice-Thermal Energy Storage System. In addition, a new load shifting mechanism for cooling load is augmented in the optimization algorithm. Therefore, all devices are utilized and operated simultaneously in a cooperative way, to mitigate the variability of the PV output and ensure reliable operation. The BESS is capable of supporting all types of loads, however, at high capital and operation cost (i.e. degradation). Thus, load shifting is implemented to reduce the stress on the BESS at peak load. Meanwhile, the ice-TESS can be utilized to support the thermal loads at a lower capital cost. The optimization results are verified with a detailed dynamic model of the microgrid components associated with the corresponding controllers. The simulation's input data are acquired from an accurate energy model of a commercial building, calibrated against real data. The optimization results are validated using the OPAL-RT for the day with the highest peak load. The experimental results demonstrated superior operational performance for the proposed cost effective Microgrid design.
Funding Information
  • Khalifa University of Science and Technology (CIRA-2018-37)
  • EU-GCC Clean Energy Technology Network, European Commission FPI service (PI/2015/370817)

This publication has 42 references indexed in Scilit: