Feasibility of shoulder use for highway work zone optimization
Authors:
- Bo DuBDBo Du
- Steven I-Jy ChienSCSteven I-Jy Chien
Open Access
- 1 August 2014
- journal article
- Published by Elsevier in Journal of Traffic and Transportation Engineering (English Edition)
- Vol. 1 (4) , 235-246
Abstract
No abstract availableKeywords
This publication has 12 references indexed in Scilit:
- Assessment of non-recurrent traffic congestion caused by freeway work zones and its statistical analysis with unobserved heterogeneityTransport Policy, 2011
- Optimal subwork zone operational strategy for short‐term work zone projects in four‐lane two‐way freewaysJournal of Advanced Transportation, 2010
- Scheduling Work Zones for Highway Maintenance ProjectsTransportation Research Record: Journal of the Transportation Research Board, 2008
- Algorithm for the Planning of Optimum Highway Work ZonesJournal of Infrastructure Systems, 2007
- Work Zone Lengths for a Four-Lane Road with an Alternate RouteJournal of Transportation Engineering, 2005
- Work Zone Optimization for Two-Lane Highway Resurfacing Projects with an Alternate RouteTransportation Research Record: Journal of the Transportation Research Board, 2005
- Freeway Work Zone Traffic Delay and Cost Optimization ModelJournal of Transportation Engineering, 2003
- Optimizing Work Zones for Two-Lane Highway Maintenance ProjectsJournal of Transportation Engineering, 2002
- Optimal Work Zone Lengths for Four-Lane HighwaysJournal of Transportation Engineering, 2001
- Proposed Model for Predicting Motorist Delays at Two‐Lane Highway Work ZonesJournal of Transportation Engineering, 1993