Minimizing maximum tardiness and delivery costs with batch delivery and job release times
Authors:
- Mohammad RostamiMRMohammad Rostami
- Omid KheirandishOKOmid Kheirandish
- Nima AnsariNANima Ansari
- 1 August 2015
- journal article
- Published by Elsevier in Applied Mathematical Modelling
- Vol. 39 (16) , 4909-4927
Abstract
No abstract availableKeywords
This publication has 35 references indexed in Scilit:
- Multi-level lot sizing and job shop scheduling with compressible process times: A cutting plane approachEuropean Journal of Operational Research, 2013
- Multi-period lot sizing and job shop scheduling with compressible process times for multilevel product structuresInternational Journal of Production Research, 2013
- Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardinessMathematical and Computer Modelling, 2013
- A multi-objective production smoothing model with compressible operating timesApplied Mathematical Modelling, 2011
- A polynomial algorithm for a one machine batching problemOperations Research Letters, 1992
- One-pass batching algorithms for the one-machine problemDiscrete Applied Mathematics, 1988
- Batching in single operation manufacturing systemsOperations Research Letters, 1985
- The one-machine sequencing problemEuropean Journal of Operational Research, 1982
- Complexity of Machine Scheduling Problems1977
- On Scheduling with Ready Times and Due Dates to Minimize Maximum LatenessOperations Research, 1975