Optimizing ventilation in medium- and short-term mine planning
- 9 March 2024
- journal article
- research article
- Published by Springer Nature in Optimization and Engineering
- Vol. 25 (4) , 2047-2072
Abstract
No abstract availableKeywords
This publication has 32 references indexed in Scilit:
- Underground production scheduling with ventilation and refrigeration considerationsOptimization and Engineering, 2022
- Underground mine scheduling under uncertaintyEuropean Journal of Operational Research, 2021
- A simulation–optimization framework for short-term underground mine production schedulingOptimization and Engineering, 2020
- Short-term planning optimization model for underground minesComputers & Operations Research, 2020
- A study of the Bienstock–Zuckerberg algorithm: applications in mining and resource constrained project schedulingComputational Optimization and Applications, 2017
- Heat stress management in underground minesInternational Journal of Mining Science and Technology, 2017
- Solving LP Relaxations of Large-Scale Precedence Constrained ProblemsLecture Notes in Computer Science, 2010
- A Priori and A Posteriori Aggregation Procedures to Reduce Model Size in MIP Mine Planning ModelsElectronic Notes in Discrete Mathematics, 2008
- Using aggregation to optimize long-term production planning at an underground mineEuropean Journal of Operational Research, 2007
- Incompressible flow relationships1993