OPTIMAL RESTORATION SCHEDULING OF DAMAGED NETWORKS IN UNCERTAIN ENVIRONMENT
Authors:
- Hitoshi FurutaHFHitoshi Furuta
- Koichiro NakatsuKNKoichiro Nakatsu
- Yasutoshi NomuraYNYasutoshi Nomura
- 1 January 2008
- journal article
- Published by Japan Society of Civil Engineers in Doboku Gakkai Ronbunshuu A
- Vol. 64 (2) , 434-445
Abstract
No abstract availableThis publication has 7 references indexed in Scilit:
- Optimal bridge maintenance planning using improved multi-objective genetic algorithmStructure and Infrastructure Engineering, 2006
- Dynamic Scheduling with Processing Time Uncertainty Using the Mixture of Periodic Optimization and Real-time SchedulingTRANSACTIONS OF THE JAPAN SOCIETY OF MECHANICAL ENGINEERS Series C, 2006
- Niigata-ken Chuetu Earthquake—Restoration of Tremendous Earthquake VictimsThe Journal of The Institute of Electrical Engineers of Japan, 2005
- Scheduling Behavior Models of Air Travel Considering UncertaintiesINFRASTRUCTURE PLANNING REVIEW, 2003
- OPTIMIZATION OF POST-EARTHQUAKE RESTORATION OF LIFELINE NETWORKS USING GENETIC ALGORITHMSDoboku Gakkai Ronbunshu, 1996
- PRACTICAL SIMULATION METHOD FOR RESTORATION PROCESS OF ROAD TRANSPORTATION SYSTEMS DAMAGED BY EARTHQUAKESDoboku Gakkai Ronbunshu, 1988
- INTER-CHAIN EFFECT OF LIFELINES ON THEIR ASEISMIC PERFORMANCEDoboku Gakkai Ronbunshu, 1987