Evaluation of Price Adjustment Coefficient for Construction Contracts
Authors:
- 17 February 2023
- journal article
- research article
- Published by Srinivas University in International Journal of Management, Technology, and Social Sciences
- p. 119-139
Abstract
Purpose: There are many bridges being constructed in Nepal. Brides of different types like Bailey truss, cable stayed, RCC Arch, pre-stressed, RCC Slab, RCC T-Beam, Steel truss, RCC Box, Stone masonry arch, suspension, and suspended bridges are being tendered and constructed at present in Nepal. Most of the bridges being constructed are of RCC T-beam and Prestressed bridges. It has been found the need to carry out research to develop logical price adjustment coefficient ranges for RCC T-beam and Prestressed bridges contracts to make the price adjustment provision more uniform. Design/Methodology/Approach: Primary data was collected by office visits, constituting focus group discussions and interviews of the beneficiaries (clients & contractors) and the secondary data was collected through the Interim payment certificates and contract documents of the selected bridge. Price adjustment calculation was done and price adjustment coefficient ranges for RCC T-girder and prestressed concrete bridges were fixed. Findings/Result: Price adjustment coefficients (Labour coefficient, Material coefficient & Equipment coefficient) were found significantly different since their corresponding weightage in bridge construction are different. Thus, different ranges are to be adopted as per their weightage which is justified by this ANOVA Test. If price adjustment coefficient ranges are not provided in the bidding document, it was seen that the contractor tried to manipulate price adjustment provision to his/her benefit. Originality/Value: The necessary ranges have been developed for coefficients of price adjustments to provide a guideline to the contractor in bidding price adjustment coefficients Paper Type: Research paperKeywords
This publication has 10 references indexed in Scilit:
- Foreign Aid Contribution for the Development of NepalInternational Journal of Management, Technology, and Social Sciences, 2021
- Foreign Aid Movements in NepalInternational Journal of Management, Technology, and Social Sciences, 2021
- Operation of Price Adjustment in Construction ProjectsInternational Journal of Case Studies in Business, IT, and Education, 2020
- Price Adjustment Practice of Road Projects in NepalJournal of Advanced Research in Construction and Urban Architecture, 2020
- Procurement Operations for ADB Borrowers: Guidance Note on Procurement in Lao2019
- Significant Factors Causing Cost Overruns in Large Construction Projects in MalaysiaJournal of Applied Sciences, 2013
- Challenges faced by construction industry in accomplishing sustainablity goals2012
- The assessment of bidding strategy of Iranian construction firmInternational Journal of Management Science and Engineering Management, 2009
- Construction bid price evaluationCanadian Journal of Civil Engineering, 2001
- Prequalification and multi-criteria selection: a measure of contractors' opinionsConstruction Management and Economics, 1998