Hybrid Model for Short-Term Scheduling of Hydropower Systems
- 1 March 2015
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Water Resources Planning and Management
- Vol. 141 (3)
Abstract
No abstract availableKeywords
This publication has 22 references indexed in Scilit:
- Risk-averse profit-based optimal scheduling of a hydro-chain in the day-ahead electricity marketEuropean Journal of Operational Research, 2007
- Unit Commitment—A Bibliographical SurveyIEEE Transactions on Power Systems, 2004
- Self-scheduling of a hydro producer in a pool-based electricity marketIEEE Transactions on Power Systems, 2002
- Optimal dispatch of generating units of the Itaipu hydroelectric plantIEEE Transactions on Power Systems, 2002
- A practical hydro, dynamic unit commitment and loading modelIEEE Transactions on Power Systems, 2001
- Experiences with mixed integer linear programming based approaches on short-term hydro schedulingIEEE Transactions on Power Systems, 2001
- Hydro system scheduling using ANN approachIEEE Transactions on Power Systems, 2000
- Integer modelling of spinning reserve requirements in short term scheduling of hydro systemsIEEE Transactions on Power Systems, 1998
- Hydro unit start-up costs and their impact on the short term scheduling strategies of Swedish power producersIEEE Transactions on Power Systems, 1997
- Daily generation scheduling: decomposition methods to solve the hydraulic problemsInternational Journal of Electrical Power & Energy Systems, 1994