Managing a Portfolio of Product Development Projects under Resource Constraints
- 14 September 2015
- journal article
- research article
- Published by Wiley in Decision Sciences
- Vol. 47 (2) , 333-372
Abstract
Managers of product development (PD) project portfolios face difficult decisions in allocating limited resources to minimize project or portfolio delay. Although PD projects are highly iterative (cyclical), almost all of the vast literature on project scheduling assumes that projects are acyclical. This article addresses this gap with a comprehensive analysis of 31 priority rules (PRs) on 18,480 portfolios containing 55,440 iterative projects. We find that the best PRs for iterative project portfolios differ significantly from those for acyclical ones, and that the best PRs at the project level differ from those at the portfolio level. The best PR depends on project and portfolio characteristics such as network density, iteration intensity, resource loading profile, and amount of resource contention. In particular, by amplifying the effects of iteration, high‐density networks hold dramatically different implications for iterative projects. Moreover, the best PR also differs depending on whether the objective is to minimize the average delay to all projects or to minimize delay to the overall portfolio. Thus, a project or portfolio manager who uses the same PR on all occasions will exhibit unnecessarily poor performance in most cases.Keywords
Funding Information
- Neeley Summer Research Award Program
- the U.S. Navy, Office of Naval Research (N00014-11-1-0739)
- University Research Board at the American University of Beirut
This publication has 65 references indexed in Scilit:
- Solving resource constrained multiple project scheduling problems by random key‐based genetic algorithmElectronics and Communications in Japan, 2009
- Project Management Practice, Generic or Contextual: A Reality CheckProject Management Journal, 2008
- A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problemInternational Transactions in Operational Research, 2007
- A Survey of Activity Network‐Based Process Models for Managing Product Development ProjectsProduction and Operations Management, 2007
- Impact of role in the decision to fail: An exploratory study of terminated projectsJournal of Operations Management, 2005
- Rush and Be Wrong or Wait and Be Late? A Model of Information in Collaborative ProcessesProduction and Operations Management, 2005
- A Simulation-Based Process Model for Managing Complex Design ProjectsIEEE Transactions on Engineering Management, 2005
- Technology portfolio management: optimizing interdependent projects over multiple time periodsIEEE Transactions on Engineering Management, 2001
- The Effect of “Front‐Loading” Problem‐Solving on Product Development PerformanceJournal of Product Innovation Management, 2000
- Heuristic Performance and Network/Resource Characteristics in Resource-constrained Project SchedulingJournal of the Operational Research Society, 1989