A Pareto-Based Estimation of Distribution Algorithm for Solving Multiobjective Distributed No-Wait Flow-Shop Scheduling Problem With Sequence-Dependent Setup Time
- 7 January 2019
- journal article
- research article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Automation Science and Engineering
- Vol. 16 (3) , 1344-1360
Abstract
Influenced by the economic globalization, the distributed manufacturing has been a common production mode. This paper considers a multiobjective distributed no-wait flow-shop scheduling problem with sequence-dependent setup time (MDNWFSP-SDST). This scheduling problem exists in many real productions such as baker production, parallel computer system, and surgery scheduling. The performance criteria are the makespan and the total weight tardiness. In the MDNWFSP-SDST, several identical factories are considered with the related flow-shop scheduling problem with no-wait constraints. For solving the MDNWFSP-SDST, a Pareto-based estimation of distribution algorithm (PEDA) is presented. Three probabilistic models including the probability of jobs in empty factory, two jobs in the same factory, and the adjacent jobs are constructed. The PWQ heuristic is extended to the distributed environment to generate initial individuals. A sampling method with the referenced template is presented to generate offspring individuals. Several multiobjective neighborhood search methods are developed to optimize the quality of solutions. The comparison results show that the PEDA obviously outperforms other considered multiobjective optimization algorithms for addressing MDNWFSP-SDST.Keywords
Funding Information
- Fundamental Research Funds for the Central Universities (NP2017208)
- Graduate Research and Innovation Projects of Jiangsu Province (KYLX16_0382)
- Postgraduate Research and Practice Innovation Program of Jiangsu Province (KYCX17_0287)
- National Natural Science Foundation of China (U1433116)
This publication has 48 references indexed in Scilit:
- The Distributed Assembly Permutation Flowshop Scheduling ProblemInternational Journal of Production Research, 2013
- An efficient tabu search algorithm for the distributed permutation flowshop scheduling problemInternational Journal of Production Research, 2013
- A Self-guided Genetic Algorithm for permutation flowshop scheduling problemsComputers & Operations Research, 2012
- An estimation of distribution algorithm for lot-streaming flow shop problems with setup timesOmega, 2012
- A DE-based approach to no-wait flow-shop schedulingComputers & Industrial Engineering, 2009
- A new multiobjective genetic algorithm with heterogeneous population for solving flowshop scheduling problemsInternational Journal of Computer Integrated Manufacturing, 2007
- An Evolutionary Algorithm With Guided Mutation for the Maximum Clique ProblemIEEE Transactions on Evolutionary Computation, 2005
- Performance assessment of multiobjective optimizers: an analysis and reviewIEEE Transactions on Evolutionary Computation, 2003
- Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approachIEEE Transactions on Evolutionary Computation, 1999
- A heuristic algorithm for the m-machine, n-job flow-shop sequencing problemOmega, 1983