In response to issues of long construction cycles, high pollution, and labor shortages in traditional cast in situ subway station construction, a refined 3D model of a large-segment prefabricated subway station was established using ABAQUS software 2024, with mechanical behavior throughout the construction process studied based on the Shenzhen Huaxia Station project case. The model incorporates a concrete inelastic damage constitutive model and a steel elastic–plastic model, accurately simulates key components, including dry joints of mortise–tenon grooves, prestressed reinforcement, and bolted connections, and implements a seven-phase construction sequence. Research findings indicate the following: (1) During component assembly, the roof vault settlement remains ≤3.8 mm, but backfilling significantly increases displacements (roof settlement reaches 45 mm, middle slab deflection measures 66.91 mm). (2) Longitudinal mortise–tenon joints develop stress concentrations due to stiffness disparities, with mid-column installation slots identified as vulnerable zones exhibiting maximum Von Mises stress of 32 MPa. (3) Mid-column eccentricity induces structural asymmetry, causing increased deflection in longer-span middle slabs, corbel contact stress differentials up to 6 MPa, and bolt tensile stresses exceeding 1.1 GPa. (4) The arched roof effectively transfers loads via three-hinged arch mechanisms, though spandrel horizontal displacement triggers 5 cm rebound in diaphragm wall displacement. Conclusions confirm overall the stability of the prefabricated structure while recommending the optimization of member stiffness matching, avoidance of asymmetric designs, and localized reinforcement for mortise–tenon edges and mid-column joints. Results provide valuable references for analogous projects.Keywords
Funding Information
- National Key R&D Program of China (2023YFC3806701)
This publication has 18 references indexed in Scilit:
- Tensile anchorage and seismic performance of U-bar connections between sidewall and bottom slabs for prefabricated subway station structuresConstruction and Building Materials, 2025
- Shear behavior of the horizontal joint with tooth groove connection and large-diameter steel bar grout lapping in reserved holeConstruction and Building Materials, 2025
- Numerical study on seismic performance of a prefabricated subway station considering the influence of construction processStructures, 2024
- Low-carbon effects of constructing a prefabricated subway station with temporary internal supports: An innovative case of Shenzhen, ChinaJournal of Cleaner Production, 2023
- Full-scale experimental study on precast bridge column with grouted sleeve connections and large-diameter reinforcing barsEngineering Structures, 2023
- A study on bearing characteristic and failure mechanism of thin-walled structure of a prefabricated subway stationFrontiers of Structural and Civil Engineering, 2022
- Experimental study on seismic behavior of prefabricated RC frame joints with T-shaped columnsEngineering Structures, 2021
- The seismic behaviour of precast concrete interior joints with different connection methods in assembled monolithic subway stationEngineering Structures, 2021
- Numerical simulation of damage evolution of Daikai station during the 1995 Kobe earthquakeEngineering Structures, 2020
- BIM-based framework for managing performance of subway stationsAutomation in Construction, 2014