The Innovative Production Enhancement Strategy of using High GOR Crude in HP/HT Reservoir to Lift Upper Reservoirs’ Production, Case Study in Iraq
- 9 November 2020
- conference paper
- Published by Society of Petroleum Engineers (SPE)
Abstract
Halfaya oilfield in Iraq, discovered in 1976, contains multiple vertically stacked reservoirs. Currently main oil reservoirs are under primary development. The remaining deepest high GOR, HP/HT carbonate reservoir with original pressure gradient of 0.867 psi/ft has been drilled, tested, but undeveloped. An innovative production strategy has been put forward highlighting that high GOR crude can be injected into the upper oil reservoirs with partially pressure depletion, as energy-conservation measure, in view of its high wellhead pressure and good productivity during drill stem tests, therefore to achieve production enhancement and synergy among reservoirs. In-house studies indicate high GOR crude can be miscible with all oils from eight zones. Field results show that injection processes can bring dead wells back production, yielding the prolific output. Also, water cut can be reduced immediately and field water cut rising trend can be mitigated. The innovative injection processes are illustrated as follows: New development wells should be deployed at updip positions to penetrate the all the hydrocarbon reservoirs with the thick pay. Run tubing string with packer. Packer is used for isolation of upper oil zones and HP/HT environment. Huff and puff process. After perforation, high GOR crude travels up the tubing string, via surface choke and a manifold with flow meter, then enter the annulus. Choke regulates the injection rate. For low-permeability (<0.1md) carbonate reservoir, e.g., Sadi reservoir, huff and puff processes are applied post multistage fracturing treatment. High GOR flood is preferred in majorly producing reservoirs with high productivity and relatively low GOR, e.g. Mishrif reservoir. Injected high GOR crude (API=32.7) can dilute remaining oil (API=19.1-23.0), reduce its viscosity, and therefore achieve production enhancement. During primary development, asphaltene deposit occurred and chemical inhibitor has been applied. After oil blending, the risk of asphaltene deposit could be minimized. First perforate lower-pressure oil zones and then open the HP/HT zone for work safety. The production enhancement strategy and processes in this paper could be of strong reference value to similar stacked reservoirs.Keywords
This publication has 13 references indexed in Scilit:
- Breaking a Paradigm: Can Oil Recovery from Shales be Larger than Oil Recovery from Conventional Reservoirs? The Answer is Yes!2018
- Eagle Ford and Pimienta Shales in Mexico: A Case Study2018
- Improved Oil Recovery through Cost Effective In-Situ Gas Injection - A Case Study of Badin2017
- Optimal Management of Topside Diluent Injection for a Heavy Oil Field2017
- Diluent Injection Optimization for a Heavy Oil Field2016
- Successful Co-Development of Oil and Gas Reservoirs, A Case Study2015
- Review of BP's Global Gas Injection Projects2014
- Use of High GOR Wells for Artificial Lift in a Mature Field - the OFON Field Case2013
- High GOR Wells Optimization, Prudhoe Bay Practice1999
- Recovery Of Heavy Oil From The Monterey Formation In Offshore California By Cyclic Injection Of Light Oil Diluent1999