Common Interface Problems among Various Construction Parties
Author:
- 1 May 2000
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Performance of Constructed Facilities
- Vol. 14 (2) , 71-74
Abstract
The objectives of this paper are to identify and assess the interface problems among the various construction parties. The methodology used in this research consists of two phases. In the first phase, a literature review and interviews with various construction professionals were conducted in order to identify the interface problems among them. This resulted in the identification of 19 common interface problems, which were classified into four categories: financial problems, inadequate contract and specification, environmental problems, and other common problems. In the second phase, a questionnaire was developed that included the identified interface problems obtained from the first phase. This survey was then randomly distributed to selected samples of 102 various construction professions consisting of owners, designers, general contractors, subcontractors, and maintenance contractors from Saudi Arabia to evaluate the severity of the 19 identified interface problems. The relative severity of the categor...Keywords
This publication has 5 references indexed in Scilit:
- Interface Problems between Building Owners and DesignersJournal of Performance of Constructed Facilities, 1996
- Interface Problems between Owners and Maintenance Contractors in Saudi ArabiaJournal of Performance of Constructed Facilities, 1995
- The Contractor‐Subcontractor Relationship: The Subcontractor's ViewJournal of Construction Engineering and Management, 1994
- Factors affecting the relationship between contractors and their sub‐contractors in Saudi ArabiaBuilding Research & Information, 1993
- Design — Construction interface problems in Saudi ArabiaBuilding Research & Information, 1992