Three-dimensional study on the hydraulic characteristics under the steam generator (SG) tube plugging operations for AP1000
Authors:
- Xiaohan ZhaoXZXiaohan Zhao
- Mingjun WangMWMingjun Wang
- Chong ChenCCChong Chen
- Xi WangXWXi Wang
- Haoran JuHJHaoran Ju
- Wenxi TianWTWenxi Tian
- Suizheng QiuSQSuizheng Qiu
- G.H. SuGSG.H. Su
- 1 April 2019
- journal article
- research article
- Published by Elsevier in Progress in Nuclear Energy
- Vol. 112, 63-74
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China (11705139)
This publication has 11 references indexed in Scilit:
- Study on the hydrogen risk in venturi scrubber filter of filtered containment venting system under PWR severe accidentNuclear Engineering and Design, 2018
- Thermal hydraulic and stress coupling analysis for AP1000 Pressurized Thermal Shock (PTS) study under SBLOCA scenarioApplied Thermal Engineering, 2017
- Development of three-dimensional thermal-hydraulic analysis code for steam generator with two-fluid model and porous media approachApplied Thermal Engineering, 2017
- Failure Analysis of Bend Tube Preheater on Heat Recovery Steam GeneratorThe International Journal of Mechanical Engineering and Sciences, 2017
- Simulation of steam generator plugging tubes in a PWR to analyze the operating impactNuclear Engineering and Design, 2016
- Development and preliminary validation of a steam generator 3D thermohydraulics analysis code STAFNuclear Engineering and Design, 2016
- Predicting the accumulated number of plugged tubes in a steam generator using statistical methodologiesAnnals of Nuclear Energy, 2008
- Westinghouse AP1000 advanced passive plantNuclear Engineering and Design, 2006
- Overview of steam generator tube degradation and integrity issuesNuclear Engineering and Design, 1999
- Steam Generator Tube Plugging and Replacement Analyses for McGuire and CatawbaNuclear Technology, 1998