Flow past Bench-Scale Vertical Ground-Water Cutoff Walls
Authors:
- 1 June 2000
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Geotechnical and Geoenvironmental Engineering
- Vol. 126 (6) , 511-520
Abstract
An experimental study was conducted to evaluate factors affecting flow rates past soil-bentonite (SB), geomembrane (GM), and composite geomembrane-soil (CGS) vertical cutoff walls. Intact walls and walls containing defects (inadequate keys, windows, and poor joint seals) were studied. For intact cutoff walls, CGS walls had the lowest flow rate, followed by SB and GM walls. CGS walls typically had flow rates as much as 100 times lower than comparable GM walls. Flow rates increased by a factor of 2–160 when the GM walls contained defective joints or the SB walls contained permeable windows. For all wall types, an effective key was required to achieve low flow rate past the wall. For GM walls, under seepage was not effectively controlled when the GM was placed in direct contact with the aquitard. Flow rates for GM walls placed in direct contact with the aquitard were nearly equal to the aquifer flow rate without a wall. Better control of underseepage was possible with SB and CGS walls placed in direct contact with the aquitard because the soft bentonitic backfill conformed to the surface of the aquitard. Hydraulic conductivity of unsealed joints in GM walls was estimated from flow rates past GM walls where a portion of the joint was unsealed. These hydraulic conductivities ranged between 1.8 × 10−4 and 5.6 × 10−3 cm/s.Keywords
This publication has 14 references indexed in Scilit:
- Freeze-Thaw Cycling and Hydraulic Conductivity of Bentonitic BarriersJournal of Geotechnical and Geoenvironmental Engineering, 1997
- The Compatibility of Slurry Cutoff Wall Materials with Contaminated Groundwater1994
- Hydraulic Conductivity of Vertical Cutoff Walls1994
- Vertical cutoff walls1993
- Design, Construction and Performance of a Soil-Bentonite Cutoff Wall Constructed in Two Stages1992
- Composite Barrier Slurry Wall1992
- USA Practice Slurry Wall Specifications 10 Years Later1992
- Geotechnics of Hazardous Waste Control Systems1991
- Leakage through liners constructed with geomembranes—part I. Geomembrane linersGeotextiles and Geomembranes, 1989
- Hydraulic Conductivity Tests on Compacted ClayJournal of Geotechnical Engineering, 1985