Modeling and Optimization of Plunger Lift Assisted Intermittent Gas Lift Installations

Authors:

Abstract
A novel mechanistic model for the design of plunger assisted intermittent gas lift installations is presented. The model considers the complete production cycle: accumulation of reservoir fluids in the wellbore, annulus pressure build-up, plunger/liquid slug rise, liquid production into flowline. It is based on the fundamental mass balance and conservation of momentum equations and considers all important parameters: reservoir pressure, inflow performance, tubing and flowline characteristics, plunger characteristics, available injection pressure, surface injection choke design, gas lift valve design and performance, etc. The model solution requires numerical techniques, and it is implemented as a computer program for personal computers and mainframe workstations. One of the most innovative characteristics of the model is that it incorporates, as part of the dynamic numerical simulation, experimental plunger rise data relating instantaneous plunger velocity to instantaneous liquid slippage past the plunger. As a result, liquid "fallback"losses can be estimated and need not be assumed. The model and computer program has been verified and validated both qualitatively and with field data. Comparisons of model predictions versus field data are included. To the best of the authors knowledge, this the first published work in which a full model of this type of artificial lift installation is undertaken. Finally, it is shown how the model can be used to obtain an optimum design of a new installation, considering both gas consumption costs and crude recovery. Furthermore, examples are included to show how to use the program to effectively optimize existing installations.

This publication has 2 references indexed in Scilit: