Planning lunar In-Situ Resource Utilisation with a reinforcement learning agent
Authors:
- T. PelechTPT. Pelech
- L. YaoLYL. Yao
- S. SaydamSSS. Saydam
- 24 September 2022
- journal article
- research article
- Published by Elsevier in Acta Astronautica
- Vol. 201, 401-419
Abstract
No abstract availableFunding Information
- University of New South Wales
This publication has 18 references indexed in Scilit:
- Technical evaluation of Off-Earth ice mining scenarios through an opportunity cost approachActa Astronautica, 2019
- Commercial lunar propellant architecture: A collaborative study of lunar propellant productionREACH, 2019
- Incorporation of Geometallurgical Attributes and Geological Uncertainty into Long-Term Open-Pit Mine PlanningMinerals, 2019
- An Introduction to Deep Reinforcement LearningFoundations and Trends in Machine Learning, 2018
- Evaluation of a mining project under the joint effect of commodity price and exchange rate uncertainties using real options valuationThe Engineering Economist, 2016
- Optimized open pit mine design, pushbacks and the gap problem—a reviewJournal of Mining Science, 2014
- Determination of the effect of operating cost uncertainty on mining project evaluationResources Policy, 2012
- Bias and Error in Mine Project Capital Cost EstimationThe Engineering Economist, 2008
- Gradient-based learning applied to document recognitionProceedings of the IEEE, 1998
- The technical and economic feasibility of mining the near-earth asteroidsActa Astronautica, 1997