Load forecast uncertainty is an important factor in long-range system planning and has been shown to have a significant impact on the calculated reliability indices in generating capacity studies. In general, a higher capacity reserve is required to satisfy a future uncertainty load than to serve a known load, at a specified level of reliability. Load forecast considerations are also important in composite generation and transmission system reliability studies, and their associated probability distributions. This paper examines the effects of load forecast uncertainty in bulk system reliability assessment incorporating changes in system composition, topology, load curtailment policies and bus load correlation levels.Keywords
This publication has 9 references indexed in Scilit:
- Basic Concepts in Generating Capacity Adequacy Evaluation2006
- Delivery Point Reliability Indices of a Bulk Electric System Using Sequential Monte Carlo SimulationIEEE Transactions on Power Delivery, 2005
- Reliability Evaluation of Power Systems1996
- Sequential Monte Carlo simulation for composite power system reliability analysis with time varying loadsIEEE Transactions on Power Systems, 1995
- The effect of load uncertainty on unit commitment riskIEEE Transactions on Power Systems, 1994
- Effect of bus load uncertainty and correlation in composite system adequacy evaluationIEEE Transactions on Power Systems, 1991
- A reliability test system for educational purposes-basic dataIEEE Transactions on Power Systems, 1989
- The IEEE Reliability Test System - Extensions to and Evaluation of the Generating SystemIEEE Transactions on Power Systems, 1986
- IEEE Reliability Test SystemIEEE Transactions on Power Apparatus and Systems, 1979