Mixed integer linear programming models to measure the economic impact of Zero-Buffers in Heijunka Flow Shop Scheduling
Open Access
- 1 April 2024
- journal article
- research article
- Published by Asociación para el Desarrollo de la Ingeniería de Organización in Dirección y Organización
- No. 82,p. 100-127
Abstract
A classic production line for mixed models with a fixed cycle time is transformed into a flowshop by removing the time restrictions at the workstations. In the new production line, the Heijunka concept of Just in Time manufacturing is applied, imposing on the sequences of products that they preserve the production mix through linear constraints. In this work, we propose a MILP model for the new problem which is solved with the IBM-CPLEX solver using the set of 23 Nissan-9Eng.I instances. It is concluded that the economic impact due to production losses is very significant when the buffers between the stations of the engine production line are suppressed (1224 €/day), while the economic impact generated by Heijunka is negligible (9.83 €/day) compared to the economic and management advantages it offers.Keywords
This publication has 36 references indexed in Scilit:
- Blocking Flowshop Scheduling Problem with Minimum Makespan and Quota Property2023
- Exact and heuristic procedures for the Heijunka-flow shop scheduling problem with minimum makespan and job replicasProgress in Artificial Intelligence, 2021
- Integration of Lean practices and Industry 4.0 technologies: smart manufacturing for next-generation enterprisesThe International Journal of Advanced Manufacturing Technology, 2020
- Mixed integer linear programming models for Flow Shop Scheduling with a demand plan of job typesCentral European Journal of Operations Research, 2018
- A GRASP algorithm for Quota sequences with minimum work overload and forced interruption of operations in a mixed-product assembly lineProgress in Artificial Intelligence, 2018
- Iterated greedy algorithms for the blocking flowshop scheduling problem with makespan criterionComputers & Operations Research, 2017
- Scheduling2016
- A review of cost and profit oriented line design and balancing problems and solution approachesAnnual Reviews in Control, 2015
- Leveling of low volume and high mix production based on a Group Technology approachCIRP Journal of Manufacturing Science and Technology, 2011
- The product rate variation problem and its relevance in real world mixed-model assembly linesEuropean Journal of Operational Research, 2009