Profinet IO IRT Message Scheduling
Authors:
- Zdenek HanzálekZHZdenek Hanzálek
- Pavel BurgetPBPavel Burget
- Premysl UchaPUPremysl Ucha
- Premysl ŠuchaPŠPremysl Šucha
- 1 July 2009
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- Vol. 22 (10683070) , 57-65
Abstract
This paper presents an algorithm that allows one to create a static schedule of the Profinet IO IRT communication, which is an industrial Ethernet protocol standardised in IEC 61158. This algorithm offers an alternative to the available commercial tool, providing comparable results regarding the resulting time schedule length. Furthermore, we extend the problem by useful time constraints providing a greater flexibility with respect to the individual messages. Due to this flexibility, it is possible to place the selected messages in various parts of the communication cycle, to define end-to-end delays, or to increase the computational time available for the main-controller application, for example. The solution is based on a formulation of the Profinet IO IRT scheduling problem in terms of the resource constrained project scheduling with temporal constraints (PS|temp|Cmax).Keywords
This publication has 21 references indexed in Scilit:
- Deadline constrained cyclic scheduling on pipelined dedicated processors considering multiprocessor tasks and changeover timesMathematical and Computer Modelling, 2008
- Timing analysis of the FlexRay communication protocolReal-Time Systems, 2007
- Combining Operational Flexibility and Dependability in FTT-CANIEEE Transactions on Industrial Informatics, 2006
- The time-triggered architectureProceedings of the IEEE, 2003
- Building models of real-time systems from application softwareProceedings of the IEEE, 2003
- Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project schedulingOR Spectrum, 2001
- Real-time fieldbus communications using Profibus networksIEEE Transactions on Industrial Electronics, 1999
- Resource-constrained project scheduling: Notation, classification, models, and methodsEuropean Journal of Operational Research, 1999
- Resource-constrained project scheduling: A survey of recent developmentsComputers & Operations Research, 1998
- A theory of timed automataTheoretical Computer Science, 1994