The ITER Magnet System
Authors:
Top Cited Papers
- 25 April 2008
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 18 (2) , 435-440
Abstract
Procurement of the ITER magnets is due to start at the end of 2007/early 2008, with the launch of the longest lead time items, the conductor and the TF coil windings. The base design for procurement was established in 2001, and the build up of the Cadarache ITER team has been accompanied by a review of the most critical, or controversial, features of the 2001 design. At the same time, an urgent R&D program has been launched to complete the necessary verification of the design solutions that are proposed. In this paper an overview will be presented of the main design features and drivers, and some of the recent issues and R&D results will be summarized.Keywords
This publication has 6 references indexed in Scilit:
- Review of the Results of the ITER Toroidal Field Conductor R&D and QualificationIEEE Transactions on Applied Superconductivity, 2008
- Design and Specifications of the ITER TF CoilsIEEE Transactions on Applied Superconductivity, 2008
- Electrical Design Requirements on the ITER CoilsIEEE Transactions on Applied Superconductivity, 2008
- Final Assembly and Installation of the ITER TF CoilsIEEE Transactions on Applied Superconductivity, 2008
- Review of Nb3Sn conductors for ITERFusion Engineering and Design, 2007
- Quality control in the design, fabrication and operation of the ITER magnetsFusion Engineering and Design, 2006