Optimal scheduling of heat-integrated multipurpose plants under fouling conditions
- 1 November 2001
- journal article
- Published by Elsevier in Applied Thermal Engineering
- Vol. 21 (16) , 1675-1697
Abstract
No abstract availableKeywords
This publication has 12 references indexed in Scilit:
- Optimal Energy and Cleaning Management in Heat Exchanger Networks Under FoulingChemical Engineering Research and Design, 2000
- Optimization of Scheduling of Cleaning in Heat Exchanger Networks Subject to FoulingFood and Bioproducts Processing, 1999
- Heat Integration For Batch ProcessesChemical Engineering Research and Design, 1998
- Mitigation of Process Heat Exchanger Fouling: an Integral ApproachChemical Engineering Research and Design, 1998
- Optimal scheduling of cyclic batch processes for heat integration—II. Extended problemsComputers & Chemical Engineering, 1995
- Optimal scheduling of cyclic batch processes for heat integration—I. Basic formulationComputers & Chemical Engineering, 1995
- Optimal Scheduling of Heat-Integrated Multipurpose PlantsIndustrial & Engineering Chemistry Research, 1994
- A new look at energy integration in multiproduct batch processesComputers & Chemical Engineering, 1993
- Heat integration in batch processingIndustrial & Engineering Chemistry Process Design and Development, 1986
- Optimum evaporator cycles with scale formationThe Canadian Journal of Chemical Engineering, 1979