Shuttle Bus Timetable Adjustment in Response to Behind-Schedule Commuter Railway Disturbance
Open Access
- 13 December 2022
- journal article
- research article
- Published by MDPI AG in Sustainability
- Vol. 14 (24) , 16708
Abstract
Shuttle bus connection is a valid technique to handle unplanned problems and promote sustainable transportation. The study describes tools that facilitate the shuttle bus timetable adjustment responding to a disturbance resulting from behind-schedule trains on a commuter railway. This behind-schedule disturbance is divided in four stages allowing for different delay ranges. The problem and its solution involve different elements, such as shuttle bus route selection, stop location, and timetable adjustment. We propose a nonlinear integer programming model, in which the objective function is based on the waiting, travelling, and walking costs for passengers as well as the operation cost of the route chosen. Vehicle capacity constraints and precise passengers’ waiting times are considered. A genetic algorithm and a simulated annealing algorithm combined with a priori decomposition are used to derive an efficient solution. A case study of a shuttle bus serving the Jinshan Railway in Shanghai, China, is tested to validate that, compared to the no-planning timetable, the total cost of the optimized timetable is reduced by 7.6%, especially including a dramatic reduction in the cost of passenger waiting time by 49.1%.Keywords
Funding Information
- National Natural Science Foundation of China (72101127, 72101126)
- Science and technology Project of Jiangsu Province, China (BK20200978)
- Graduate Research and Practice Innovation Program of School of Transportation and Civil Engineering, Nantong University, China (NTUJTXYGI2203)
- CCF-Tencent Open Fund (CCF-Tencent IAGR20220111)
This publication has 31 references indexed in Scilit:
- Solving vehicle routing problem by using improved genetic algorithm for optimal solutionJournal of Computational Science, 2017
- Coordination of Feeder Bus Schedule with Train Service at Integrated Transport HubsTransportation Research Record: Journal of the Transportation Research Board, 2017
- Optimizing Bus Bridging Services in Response to Disruptions of Urban Transit Rail NetworksTransportation Science, 2016
- Design of limited-stop bus service with capacity constraint and stochastic travel timeTransportation Research Part E: Logistics and Transportation Review, 2015
- Demand-responsive transit circulator service network designTransportation Research Part E: Logistics and Transportation Review, 2015
- An overview of recovery models and algorithms for real-time railway reschedulingTransportation Research Part B: Methodological, 2014
- A Methodology to Promote Sustainable Mobility in College CampusesTransportation Research Procedia, 2014
- Exact and heuristic methods for public transit circulator designTransportation Research Part B: Methodological, 2010
- Optimal Routing Design for Shuttle Bus ServiceTransportation Research Record: Journal of the Transportation Research Board, 2006
- Simulated AnnealingStatistical Science, 1993