Performance measurement based on a total quality approach
Authors:
- 21 June 2011
- journal article
- Published by Emerald Publishing in International Journal of Productivity and Performance Management
- Vol. 60 (5) , 512-528
Abstract
Purpose – The steel industry is a capital-intensive industry and equipment utilisation as effectively as possible is of high priority. One of the key difficulties in the steel industry is the need to synchronise several processes to create a flow through every machine and plant. This paper aims to introduce the concept of integrated equipment effectiveness (IEE), which is a new approach for overall equipment effectiveness (OEE) measurement in three elements, consisting of “OEE loading-based”, “OEE capital-based”, and “OEE market-based” so as to meet these essential requirements. Design/methodology/approach – Based on a comprehensive scheme for loss analysis, the concept of integrated equipment effectiveness is developed. The case study is conducted in the factory of one large Asian steel-making company in order to examine the proposed model. Findings – The case study reveals the importance of the new scheme for loss analysis in a steel-making plant. IEE gives managers of steel plants a whole perspective on effectiveness. It also indicates the level of synchronisation of a specific machine for making steel within an entire organisation. Practical implications – IEE monitors the manufacturing process to utilise equipment effectively as much as possible and also measures equipment effectiveness for the full process cycle in order to respond to the market. IEE makes communication easier and more efficient. It provides a sound perspective on improvement in steel making and also can be used as a benchmark. Originality/value – The paper provides information on a new method for precise estimation of equipment effectiveness in a steel-making plant. It helps in optimising resource allocation and in improving strategic decision-making.Keywords
This publication has 13 references indexed in Scilit:
- Evaluation of overall equipment effectiveness based on marketJournal of Quality in Maintenance Engineering, 2010
- Overall equipment effectiveness of a manufacturing line (OEEML)Journal of Manufacturing Technology Management, 2008
- Evaluation of overall line effectiveness (OLE) in a continuous product line manufacturing systemJournal of Manufacturing Technology Management, 2006
- Combining optimisation and simulation for steel production schedulingJournal of Manufacturing Technology Management, 2005
- Equipment Effectiveness: OEE RevisitedIEEE Transactions on Semiconductor Manufacturing, 2005
- Utility and stability measures for agent-based dynamic scheduling of steel continuous casting2004
- An efficient scheduling algorithm for the hot coil making in the steel mini-millProduction Planning & Control, 2002
- Measurement of overall equipment effectiveness as a basis for TPM activitiesInternational Journal of Operations & Production Management, 1998
- Steel production schedule generationInternational Journal of Production Research, 1997
- Performance Measures: Gaps, False Alarms, and the “Usual Suspects”International Journal of Operations & Production Management, 1994