Algorithms for Scheduling Multi-Level Just-In-Time Production Systems
Authors:
- 1 May 1992
- journal article
- research article
- Published by Taylor & Francis in IIE Transactions
- Vol. 24 (2) , 121-130
Abstract
Many companies are using Just-In-Time (JIT) control systems in their mixed-model multi-level production facilities. When scheduling these facilities the most important objective is to keep a constant rate of usage for every part used by the system. In this paper a mathematical model for scheduling these facilities is studied and techniques for determining good schedules are developed. Procedures for solving very large problems are given.Keywords
This publication has 10 references indexed in Scilit:
- Scheduling mixed-model multi-level just-in-time production systemsInternational Journal of Production Research, 1989
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production SystemsManagement Science, 1989
- Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated SystemsManagement Science, 1984
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem ReductionManagement Science, 1983
- A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyorInternational Journal of Production Research, 1979
- Optimal mixed-model sequencing for balanced assembly linesOmega, 1977
- Assembly line sequencing for model mixInternational Journal of Production Research, 1975
- Computer Simulation for Mixed-Model Production LinesManagement Science, 1973
- Production-Line Balances for Mixed-Model LinesManagement Science, 1972
- Mixed Model Line Balancing with Smoothed Station AssignmentsManagement Science, 1970