EVMS for Nuclear Power Plant Construction: Variables for Theory and Implementation
- 16 June 2011
- conference paper
- Published by American Society of Civil Engineers (ASCE)
- p. 728-735
Abstract
It is anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction are expected to fall (Richardson 2010). In order to attain competitive advantages under the globalized market, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners as well as the researchers. In this context, the purpose of this paper is to identify major variables that characterize the real-world Earned Value Management System (EVMS) implementation for nuclear power plant construction. Distinct attributes of nuclear power plant construction were investigated first. Organizational policies, measurement techniques, data collection methods for nEVMS were then developed. A case-project is briefly introduced in order to validate the viability of proposed methodology. This study is conducted as part of effort developing an organization-wide EVMS system from an owner's perspective.Keywords
This publication has 5 references indexed in Scilit:
- Building information modelling (BIM) framework for practical implementationAutomation in Construction, 2011
- Automated Front-End Planning for Cost and Schedule: Variables for Theory and Implementation2008
- Knowledge-Based Standard Progress Measurement for Integrated Cost and Schedule Performance ControlJournal of Construction Engineering and Management, 2007
- Flexible Work Breakdown Structure for Integrated Cost and Schedule ControlJournal of Construction Engineering and Management, 2004
- Cost‐ and Schedule‐Control Integration: Issues and NeedsJournal of Construction Engineering and Management, 1991