A study of non-compliance with quality requirements in Uganda
- 1 February 2015
- journal article
- Published by Emerald Publishing in Proceedings of the Institution of Civil Engineers - Management, Procurement and Law
- Vol. 168 (1) , 22-42
Abstract
Quality failures in public building construction are increasingly being noted, partly due to the prevailing environments in which contractors are selected on lowest bid prices, but also because the initiatives of certifying quality-compliant companies are mainly used for the enhancement of a company's public image for marketing purposes. This problem is further compounded because these projects are prone to ‘graft’ and other undesirable individualistic characteristics that exist within a construction project organisational setting. The primary aim of the research was to determine causal factors, examine derivative impacts and propose mitigation measures for non-compliance to quality requirements. A questionnaire survey approach was adopted and appropriate statistical analyses conducted. Responses to the causality factors, derivative impacts and mitigation measures were then analysed. The three strong causality factors were inadequate communication, graft and dishonesty. Safety failures, increased building maintenance costs and reduction in building lifespan were identified as the three strong derivative impacts. The three strong plausible mitigation measures were stringent action on public sector graft, increased quality testing of materials and improved procurement practices. The research highlights the need for best practices that encourage a whole-life value philosophy and the curbing of graft in public sector procurement.Keywords
This publication has 27 references indexed in Scilit:
- An exploratory study of rework causality in UgandaConstruction Innovation, 2013
- Use and misuse of the concept of cultureConstruction Management and Economics, 2013
- Applying TQM to the construction industryThe TQM Journal, 2012
- Managing the Brief for Better Design2010
- AN ASSESSMENT OF CLIENTS’ PERFORMANCE IN HAVING AN EFFICIENT BUILDING PROCESS IN UGANDA/UŽSAKOVO DALYVAVIMO EFEKTYVIAME STATYBOS PROCESE ĮVERTINIMAS UGANDOJEJOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2008
- The role of organizational culture in motivating innovative behaviour in construction firmsConstruction Innovation, 2006
- Re‐engineering the whole life cycle costing processConstruction Management and Economics, 2005
- Combining various facets of uncertainty in whole‐life cost modellingConstruction Management and Economics, 2004
- Development of a generic framework for collecting whole life cost data for the building industryJournal of Quality in Maintenance Engineering, 2002
- Theories of Organizational CultureOrganization Studies, 1984