An investigation of changing requirements with respect to development phases of a software project
Authors:
- 1 October 2010
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 323-327
Abstract
Many requirement changes are proposed during the lifecycle of a software project. Management of these changes is, therefore, necessary for the successful development of a software project. For the management of the changing requirements, it is necessary to investigate the changing requirements with respect to development phases of a software project. In this paper, data is collected from the software industry of Pakistan and changing requirements are analyzed with respect to all development phases of a software project. By using the descriptive statistics, and Spearman's rho, the relationship of changing requirements among all development phase of a software project is analyzed. It has been identified that customer requests for changes in each development phase of a software project. However maximum change requests are received from customer in maintenance phase of the software project. It has been identified that if more changes are requested in early development phases, then fewer changes are requested in later development phases of a software project. There is a significant relationship between the changes requested in the requirement analysis phases and the changes requested in the design phase. There is also a significant relationship between the changes requested in the design phase and the changes requested in the testing phase.Keywords
This publication has 13 references indexed in Scilit:
- Story-Wall: A Concept for Lightweight Requirements Management2007
- An empirical study of industrial requirements engineering process assessment and improvementACM Transactions on Software Engineering and Methodology, 2005
- Assessment of the requirements management process using a two-stage questionnaire2004
- Analysis of requirements volatility during software development life cycle2004
- Measuring the success of requirements engineering processes2002
- Requirements management for the incremental development model2002
- IT projects: sink or swimThe Computer Bulletin, 2000
- Causal analysis of the requirements change process for a large system1997
- When professional standards are laxCommunications of the ACM, 1994
- No Silver Bullet Essence and Accidents of Software EngineeringComputer, 1987