Abstract
Data centers have become integral to contemporary infrastructure. However, their electricity demand significantly adds to global energy consumption, resulting in substantial electricity costs and carbon footprints. Power purchase agreements, when used as bilateral long-term contracts for procuring renewable energy, not only hedge against volatility in an electricity market to secure locked-in prices but also play a crucial role in reducing carbon emissions. This paper studies the strategy of a data center to sign such power purchase agreements, which encompasses an optimal agreement design problem (static) and an optimal signing timing problem (dynamic) to maximize long-term expected electricity cost savings. In particular, we develop a continuous-time stochastic process model for long-term market price evolution in an electricity market, alongside a power purchase agreement model comprising the starting time, contract term, contractual power supply, and locked-in price. These models enable a novel problem formulation for PPA signing, which further allows for a tractable solution via decomposition. We first fix an arbitrary starting time and explicitly analyze how to set the other three variables with the most expected total saving. We then propose a dynamic threshold policy that online identifies an optimal starting time based on real-time observations of market prices. The proposed strategy is extensively tested with simulation experiments to validate our theoretical analysis. Numerical results also provide additional insights–over 35% reduction in long-term total electricity expenditure can be made possible for data centers, as long as power purchase agreements are properly signed.
Funding Information
  • National Natural Science Foundation of China (72201007)
  • National Natural Science Foundation of China (72431001)
  • National Natural Science Foundation of China