Unrelated parallel-machine scheduling problems with multiple rate-modifying activities
Authors:
- Dar-Li YangDYDar-Li Yang
- Suh-Jenq YangSYSuh-Jenq Yang
- 1 June 2013
- journal article
- Published by Elsevier in Information Sciences
- Vol. 235, 280-286
Abstract
No abstract availableThis publication has 10 references indexed in Scilit:
- Parallel machines scheduling with a deteriorating maintenance activityJournal of the Operational Research Society, 2011
- Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion timeInformation Sciences, 2011
- Parallel machines scheduling with simultaneous considerations of position-dependent deterioration effects and maintenance activitiesJournal of the Chinese Institute of Industrial Engineers, 2011
- Scheduling with job-dependent learning effects and multiple rate-modifying activitiesInformation Processing Letters, 2010
- Two-parallel machines scheduling with rate-modifying activities to minimize total completion timeEuropean Journal of Operational Research, 2009
- Parallel-machine scheduling of simple linear deteriorating jobsTheoretical Computer Science, 2009
- Parallel-machine scheduling with time dependent processing timesTheoretical Computer Science, 2008
- A note on parallel-machine scheduling with deteriorating jobsJournal of the Operational Research Society, 2007
- Single machine scheduling with a restricted rate‐modifying activityNaval Research Logistics (NRL), 2005
- Machine scheduling with a rate-modifying activityEuropean Journal of Operational Research, 2001