Spanish Compliance Standard for RfG Grid Connection

Authors:

Abstract
The Commission Regulation (EU) 2016/631 of the 14th of April 2016 establishing a network code on requirements for grid connection of generators introduces a framework for building a structural harmonization of technical stipulations across Europe. Network operators must implement this regulation in national grid codes or federal legislation. This regulation requires new power generating modules (PGM) connected to the system to satisfy technical requirements throughout its life. Therefore, provisions on compliance testing and simulation are introduced during the PGM commissioning stage. This paper describes the PGM certification structure related to this regulation in Spain in the form of technical standards (NTS) for the conformity assessment. NTS is a guideline for submitting the corresponding PGM conformity certificates and the final version is planned by the end of 2020.